Buying the lot is step one. Here is what comes next when you build at Lake of the Ozarks, and the local builders we recommend.

Before you build

  • Soil test and septic permit. On lots without sewer, a Missouri soil evaluator tests the soil first. Camden County requires a septic permit for lots under 3 acres and for lots on the lake. See Septic or Sewer?
  • POA approval. In Four Seasons (Horseshoe Bend and Porto Cima), the Architectural Control Committee approves plans in writing before any work, including tree removal. See Building on a Four Seasons Lot
  • Water and sewer hookups. Where public water or sewer is available, connection fees apply. Each listing shows its utilities.
  • Driveway. A driveway onto a county road needs a Road and Bridge permit.
  • Digging and clearing. Call Missouri 811 at least 3 working days before you dig. Missouri requires a land disturbance permit when you clear or grade 1 acre or more.

Featured builders

We are lining up local builders we trust to build on our lots. Check back soon, or call or text 573-480-0117 and we will point you to someone.

Are you a builder?

Our buyers own a lot and need a house built. Featured builders get a spot on this page and in front of buyers on our lot pages. Apply below and we will be in touch.

← Back

Thank you for your response. ✨

Sign In

Register

Reset Password

Please enter your username or email address, you will receive a link to create a new password via email.

Like us on FacebookFollow us on X @BlackWhiteLndFind us on Google